Monday to Saturday, 7:30am to 5:30pm  ·  10 year workmanship guarantee on all roofing work, in writing Hull 01482 961 240Scunthorpe 01724 514 178Lincoln 01522 458 144
Pitched roofing by RoofRite Roofing

Pitched roofing in Hull, Scunthorpe and Lincoln

Tile and slate roofs stripped, re-covered and finished properly, from a single slope to a full house. Free survey, written quote, 10 year workmanship guarantee.

Free quote for pitched roofing

Tell us about the roof and we will come and look at it.

Step 1 of 2

We only use your details to quote for the work you have asked about. No sales calls about anything else.

  • Directly employed roofers, never subcontracted
  • Free survey and photographs of what we find
  • 10 year workmanship guarantee on all roofing work, in writing
  • Covering Hull, Scunthorpe, Lincoln and the towns around them
  • Expert Roofer Verified Expert Roofer Verified
  • 10 year workmanship guarantee on all roofing work, in writing
  • 25 year guarantee on EPDM Firestone rubber flat roofs
  • Directly employed roofers
  • Free survey, written quote

Pitched roofing across Hull, Scunthorpe and Lincoln

Pitched roofing in Hull, Scunthorpe and Lincoln, carried out by our own directly employed roofers. A pitched roof fails slowly, then all at once. Nail fatigue lets tiles slip one by one, the underlay perishes behind them, and by the time a ceiling stains the battens have usually been wet for a season or two. We survey the whole slope before quoting, so you find out whether you are looking at a repair, a partial strip or a full re-cover, and you get the number in writing.

What our pitched roofing work covers

  • Full strip and re-coverOld covering, battens and underlay off, decking checked, new breathable membrane and treated battens fixed, new or reclaimed tiles laid to the manufacturer's fixing spec.
  • Partial re-coversOne slope, one elevation or one section where the rest of the roof has life left in it.
  • Ventilation put rightEaves, ridge and, where the build up needs it, tile vents, so the loft breathes and the membrane is not asked to do a job it cannot do.
  • Verge and ridgeMechanically fixed dry verge and dry ridge as standard on re-covers, or bedded and pointed where the property calls for it.
  • Flashings and abutmentsNew lead soakers, step flashings, back gutters and valley linings while the roof is open.
  • Roof windowsNew rooflights fitted into the covering with the correct flashing kit, or existing ones re-flashed.

Signs you need pitched roofing work

  • Tiles slipping or sitting proud after wind, usually a sign the nails have gone
  • Daylight through the underlay when you look up from inside the loft
  • Underlay sagging between rafters, torn, or crumbling when touched
  • Damp patches on upstairs ceilings that come back after every heavy rain
  • Mortar dropping out of the ridge or verge onto the drive
  • Moss holding water on the north slope and lifting the tail of the tiles

What actually goes wrong with a pitched roof

Most roofs in this region are either concrete interlocking tiles from the 1960s to 1980s, clay pantiles on older stock, or natural and fibre cement slate. Concrete interlockers are usually fine long after the fixings are not, which is why a roof can look sound from the pavement and still be shedding tiles. Clay pantiles last far longer than the mortar holding the ridge and verge, so the failure point is the bedding, not the tile. Slate almost always fails at the nail first, and once one or two slates slip the ones around them lose their support.

Underneath, the bituminous felt used before breathable membranes became standard has a service life of its own. It goes brittle, tears along the batten line and stops carrying water to the gutter. That is the layer doing the real work when wind drives rain under the tiles, and it is the reason a roof with a perfectly good covering can still leak.

Worth knowing. We photograph the roof before we start and again when it is finished, so you can see what was under the tiles, not just take our word for it.

What affects the price of pitched roofing

We will not put a figure on this page, because a roof price given without seeing the roof is a guess. These are the things that actually move the number:

  • Roof area and pitch, and whether the covering is tile, slate or a mix
  • Access and scaffold, which is more involved on a terrace or a tight plot than a detached bungalow
  • Whether the battens and decking can stay or need replacing once the covering is off
  • New tiles against carefully reclaimed ones, which matters on older and conservation properties
  • Leadwork, valleys and chimney work picked up while the roof is open
  • Skips and waste, since a full strip on an average semi fills more than people expect

The survey and the written quote are free, and the quote is itemised so you can compare it properly against anyone else's.

Talk to your local office

Three offices, three numbers, and the crews that cover your area.

Or get a quote online
Pitched roofing work in progress
Pitched roofing, our own work.

Recent work

Pitched roofing we have carried out

Completed terracotta pantile roof with two dormer windows and a chimney
Full re-roofCompleted terracotta pantile roof with two dormer windows and a chimney
Anthracite pantile roof with mechanically fixed dry hip and ridge
Full re-roofAnthracite pantile roof with mechanically fixed dry hip and ridge
New plain tiled hipped roof with scaffold still standing
Pitched roofNew plain tiled hipped roof with scaffold still standing

How it works

From first call to finished roof

  1. Free surveyWe come out, get on the roof where we can, and photograph what we find. No charge and no obligation.
  2. Written quoteAn itemised quote you can compare against anyone else's, with the scope written down rather than described.
  3. The workOur own roofers, the property protected, the site kept tidy and the roof made watertight every night.
  4. Sign off and guaranteeFinal photographs, a walk round, and your written guarantee.

FAQs

Questions about pitched roofing

How long does a pitched roof replacement take?

On an average three bedroom semi, a full strip and re-cover is usually four to six working days once the scaffold is up, weather allowing. Larger or more complex roofs with multiple hips, valleys and chimneys take longer, and we tell you the expected run at quote stage rather than after we start.

Can you re-roof one side of a house?

Yes. If the front slope is the failed one and the rear has life left, a single slope re-cover is a sensible piece of work and we quote it that way. What we will not do is sell you a full re-roof when half of it does not need touching.

Do I need to move out while the roof is off?

No. The roof is covered and made watertight at the end of each working day and you can live in the house throughout. We will let you know which days are noisiest, usually the strip.

Will you match my existing tiles?

On a partial re-cover we match as closely as the range allows, and where the original tile is discontinued we will show you the nearest current equivalent before ordering. On older properties reclaimed tiles are often the better answer and we will say so.

Is the work guaranteed?

Yes. All roofing work carries a 10 year workmanship guarantee from RoofRite Roofing Ltd, given to you in writing at sign off, alongside the manufacturer's own cover on the materials.

Free survey, written quote, no pressure

We will look at the roof properly and tell you what it needs. If it does not need this work, we will say so.

Free roof surveyWritten quote, no obligation
Get my quote